115 Electrical Solutions (Pty) Ltd is a South African Engineering Procurement & Construction (EPC) organization, which has positioned itself to offer the ultimate customer experience through its distinguished expertise in the electrical, mechanical, control and instrumentation engineering fratenity.
Industrial Electrical Contracting
LV and MV reticulation designs & installations
Switchgear and protection systems
Our designs and installations include:
Latest Track Record
Client | Service Description | Status |
---|---|---|
Eskom Holdings (SOC) Ltd | Appointment of a contractor for electrical repairs required to bring Unit 2 back into operation from an outage at Duvha Power Station | Active |
Coca Cola Beverages South Africa (Pty) Ltd | PTA Line 8 Project: Electrical installation and services required at the CCBSA Pretoria Manufacturing Plant | Completed |
TSK Bartlett (Pty) Ltd | Supply, install, test and commission electrical infrastructure for new facilities at CCBSA Clayville plant | Completed |
TSK Bartlett (Pty) Ltd | Supply, install, test and commission electrical Infrastructure for new facilities at the Coca Cola plant in Polokwane | Completed |
Coca Cola Beverages South Africa (Pty) Ltd | Design, manufacture, supply, install, test and commission all electrical equipment including power cables, cable trays, distribution boards and new accessories required to supply new forklift charging stations at CCBSA Polokwane and Premier plants | Completed |
Sentech (SOC) Ltd | The appointment of electrical contractors on a panel of pre - qualified service providers for electrical infrastructure upgrade at various Sentech Transmitter Stations on an as and when required basis for a three-year period | Completed |
ERWAT (SOC) Ltd | Design, Supply, Delivery, Installation and Commission ing of Module 1 Aerator Cabling | Completed |
Afrisam (Pty) Ltd | Replacement of Busbar B SF6 at Ulco Cement Factory | Active |
Ephraim Mogale Local | Supply and replace 440m old XLPE cable from 713 to 561 in Ext 5 | Completed |
Ephraim Mogale Local | Supply and installation of a 740m PILC, 11kV Cables in Ext 5 | Completed |
Eskom Holdings (SOC) Ltd | Unit 4 LV circuit breaker replacement at Duvha Power Station | Completed |
Gateway Airport Authority Limited | Appointment of service providers for Electrical services for a period of 36 months | Active |